Concrete mixing plant, mixing plant, mixer, mechanical equipment production line

Concrete mixing plant, mixing plant, mixer, mechanical equipment production line

  • Categories:Company news
  • Author:
  • Origin:
  • Time of issue:2021-11-02
  • Views:31

(Summary description)Concrete mixing plant, mixing plant, mixer, mechanical equipment production line

Concrete mixing plant, mixing plant, mixer, mechanical equipment production line

(Summary description)Concrete mixing plant, mixing plant, mixer, mechanical equipment production line

  • Categories:Company news
  • Author:
  • Origin:
  • Time of issue:2021-11-02
  • Views:31
Information

The powder bin top mounted environment-friendly mixing building is composed of aggregate batching system, inclined belt conveyor, bottom concrete foundation, main structure, metering system, mixing system, air control system, electric control system, powder bin and screw conveyor. After the dump truck weighs, the aggregate is unloaded into the hopper without loader. The aggregate is sent to the designated stockyard through the feeding belt conveyor and distributing belt conveyor. The fully automatic feeding system saves the cost of backyard charging, and uses all the enclosed stack yard to spray and dust, which completely eliminates the pollution caused by dust. The sand in the aggregate is measured by lining vibrator to ensure smooth blanking and improve efficiency.
The inclined belt conveyor adopts external shaft mounted driving drum, polyurethane wear-resistant scraping plate and spiral idler to solve the problems of idler sticking, difficult cleaning and easy belt deviation. The aggregate enters the aggregate storage bin, the pulse dust collector collects the dust, and the clean water and sewage are measured cumulatively respectively. After the admixture is measured, it is discharged into the clean water. After the powder measurement is completed, close the spiral outlet butterfly valve to improve the measurement accuracy.
The double horizontal shaft mixing host adopts new shaft end seal and high chromium lining plate, blade, high mixing efficiency and long service life. The size and angle of the feed inlet are professionally designed, and the mixing shaft is washed by the pressure pump to effectively prevent shaft holding and reduce the maintenance cost. The hopper can store a tank of concrete, improve the productivity of the mixing plant, and prevent splashing when unloading concrete.
Animation system of three-dimensional simulation demonstration of mixer in concrete mixing station
The electric control system adopts Taiwan Advantech fan free embedded industrial control computer, Schneider and OMRON electrical components, and cooperates with the independently developed PLC control module and concrete production control management software to realize the automatic management of concrete production, and the ERP interface is reserved. Concrete structure is adopted below the mixer, with small vibration, low noise and large internal space. Operation, dispatching, experiment and maintenance can be centralized to improve work efficiency.
The powder bin is loaded at low pressure to save energy consumption, reduce noise and reduce maintenance cost. The powder bin is equipped with pulse dust collector as standard, and the patch sensor can display the material capacity in the bin in real time. The dust removal bin in the middle can solve the dust pollution and the maintenance of the filter element to the greatest extent. The powder bin is concentrated above the main building, saving the packaging area and grand appearance. At the same time, the mixing plant is also equipped with sand separator, filter press, sewage mixer, car washing machine and other environmental protection auxiliary equipment. The environment-friendly mixing plant truly realizes no noise, dust pollution, no waste water and waste residue discharge, beautiful appearance, reasonable overall planning and perfect integration with the city.
The project station has the characteristics of compact structure, modularization, high measurement accuracy, compact structure, small floor area, no foundation design for the main building and powder bin, saving limited construction site for the project, high modularization of the whole set of equipment, convenient transfer and transportation of container plate external seal installation, rapid installation and saving hoisting cost.
There are many national infrastructure projects with strict requirements. It is equipped with steel bin batching machine, coarse and fine measurement of aggregate, cement, fly ash and mineral powder, which are measured independently through parent-child screw conveyor, and fine measurement of clean water and admixture as standard. The metrology scale designed by our company, combined with the independently developed control system, meets the strict standards of high-speed railway project and realizes 100 plates and 100 standards. The feeding height of the batching machine is low, which saves the basic cost. The inclined belt conveyor does not scatter materials and saves the manual cleaning cost. Three dimensional simulation demonstration animation production of concrete mixing plant, mixing plant, mixer and industrial mechanical equipment production line.
Through 3D animation, the production of 3D simulation demonstration animation of concrete mixing plant, mixing building and mixer industrial machinery and equipment production line, and the 3D simulation demonstration animation of process flow are clearly displayed. Three dimensional animation simulates the operation status of mechanical equipment such as concrete mixing station, concrete mixer, automatic unpacking machine, batching machine, screw conveyor, sand and gravel separator, etc. Whether it is the product demonstration and publicity animation or the principle display animation of industrial machinery and equipment, it will conduct on-the-spot investigation in the enterprise, from production to soundtrack.

Scan the QR code to read on your phone

HAOJIETE

Liuzhou Hugest Chemical Machinery Co., Ltd.

Add. : Luowei Industrial Zone E-02-05, Liuzhou, Guangxi, China
Tel 
+86-772-3110101/3111039 

Fax : +86-772-3137802
E-mailHugestzhou@mix-planet.com  Markzhou50@hotmail.com

 

HAOJIETE

扫一扫,查看手机版

Copyright  ©  2021 Liuzhou Hugest Chemical Machinery Co., Ltd.    桂ICP备12001036号  BY:300.CN